Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Here, you can define a likelihood reference table. Similar to the consequence reference table this is meant to assist users in choosing a likelihood level for risks by illustrating the Likelihood Rating with an extended description. This tab enables Risk Managers to define and edit this grid.

  • STEP 1: Click 'Likelihood Table'. Likelihood ratings defined within the Criteria area are listed on the left. 

Image Modified
  • STEP 2: Click Edit and type in a description in the adjacent text boxes.

Image Modified

This will appear in the assessment areas as follows when assessing the criteria:

Image Modified

<< Back to main section
Risk Assessment

Image Modified