Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

This settings page enables you to define how multiple consequences are handled during a risk assessment. When the setting is ON, you can select multiple consequences for a single risk scenario. The overall consequence rating will then be determined based on your chosen method, either by using the maximum (MAX) consequence rating or the average (AVG) consequence rating. This setting ensures a comprehensive and accurate evaluation of potential outcomes, enhancing the robustness of your risk assessment process.

Info

Note: "Multiple Consequences" is a one-time configuration. If you require any changes afterward, please contact Camms Support for assistance.

...

  • STEP 1: Enabling Multiple Consequences Navigate to Framework > Risk Settings.

  • STEP 2: Click on Multiple Consequences to open the settings page, Toggle the Enable Multiple Consequences button ON.

...

  • STEP 3: Choose the Consequence Type:

    • Max: Selects the highest value of all selected consequences.

    • Average: Calculates the average value of all selected consequences by dividing the sum of all selected consequence values by the number of consequences selected.

  • STEP 4: To configure the Consequence fields within Risk Setting, Navigate to Mega Menu > Administration > Risk Settings > Criteria > Criteria Configuration tab.

...

  • STEP 5: Select ‘Consequence’ from the ‘Risk Criteria Name’ dropdown, Click Add New to add new Risk Criteria Rating types. Fill in all mandatory fields.

Info

Note: Use the Edit and Delete buttons to modify or remove Risk Criteria Rating types as needed

...

  • STEP 4: Click the Save button at the top to save details.

...