This area allows you to define a consequence reference table. The consequence reference table is meant to assist users in choosing a consequence level for risks by illustrating the description of Consequence (for if the risk were to occur) against each Risk Category defined. 

  • STEP 1: Click ‘Consequence Table'.

Image Modified
  • STEP 2: Select the 'Project Risk' from the ‘select risk type’ dropdown.

Image Modified
  • STEP 3: Simply click inside each cell and type in any text as needed.

Click on the ‘Maximise’ button in order to maximise the screen for data input:

Image Modified
Image Modified
  • STEP 4: Click the Save  icon to save the details.

Image Modified

This will appear in the assessment areas as follows when assessing the criteria:

Image Modified
Tip

Tip: Based on the settings you have enabled, one or more Impact ratings can be selected and saved from here.