Settings – Risk Assessment – Consequence Table

This area allows you to define a consequence reference table. The consequence reference table is meant to assist users in choosing a consequence level for risks by illustrating the description of Consequence (for if the risk were to occur) against each Risk Category defined. 

  • STEP 1: Click Consequence Table.

Figure 1.1
  • STEP 2: Select the Project Risk from the ‘select risk type’ dropdown.

Figure 1.2
  • STEP 3: Simply click inside each cell and type in any text as needed.

Click on the Maximise button in order to maximise the screen for data input:

  • STEP 4: Click the Save icon to save the details.