This area allows you to define a consequence reference table. The consequence reference table is meant to assist users in choosing a consequence level for risks by illustrating the description of Consequence (for if the risk were to occur) against each Risk Category defined. 

  • STEP 1: Click ‘Consequence Consequence Table'.

Image RemovedImage Added
  • STEP 2: Select the 'Project Risk' from the ‘select risk type’ dropdown.

  • STEP 3: Simply click inside each cell and type in any text as needed.

Click on the

‘Maximise’

Maximise button in order to maximise the screen for data input:

Image Modified
  • STEP 4: Click the

Save  icon
  • Save icon to save the details.

Image Modified

This will appear in the assessment areas as follows when assessing the criteria:

Image RemovedImage Added
Tip

Tip: Based on the settings you have enabled, one or more Impact ratings can be selected and saved from here.

View other articles under this section:

Child pages (Children Display)
pageProject Settings – Risk Assessment

<< Back to main section
Risk Assessment

Image RemovedUG Footer 2024-20240103-072111.pngImage Added