Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 10 Next »

This area allows you to define a consequence reference table. The consequence reference table is meant to assist users in choosing a consequence level for risks by illustrating the description of Consequence (for if the risk were to occur) against each Risk Category defined. 

  • STEP 1: Click Consequence Table.

  • STEP 2: Select the Project Risk from the ‘select risk type’ dropdown.

  • STEP 3: Simply click inside each cell and type in any text as needed.

Click on the Maximise button in order to maximise the screen for data input:

  • STEP 4: Click the save icon to save the details.

This will appear in the assessment areas as follows when assessing the criteria:

Tip: Based on the settings you have enabled, one or more Impact ratings can be selected and saved from here.


<< Back to main section
Risk Assessment

  • No labels