Integration between the Products

Integration between the Products

The below diagrams will explain the integration (links and synch) between each of the products for Project (Projects), Strategy (Planning), Talent (personnel evaluation), and Risk (Risk).

Figure 1.1

The relationship diagram below is the standard way in which the system is linked. However, there are many settings and/or parameters that can be configured in order to change certain linkages. This is further explained below in the Parameter/Setting Options.

Figure 1.2
Figure 1.3

These parameters/setting options are usually setup at scoping of the product to ensure that you have the correct business rules that suit your organisation. Riskonnect can change these for you at any stage to change the behaviour.

Figure 1.4

Please contact our Support Team via the Riskonnect Success Portal (RSP) if you have any further questions or if you have any issues with any of the synch/linkage options.