Risk Settings – Consequence Table
This settings page lets you define the consequence rating descriptions for each risk category. Common categories for risk types will share the same consequence descriptions.
STEP 1: Click Consequence Table settings under Risk Settings.
STEP 2: Select the risk type from the Select Risk Type dropdown.
STEP 3: Select the Hierarchy dropdown.
STEP 4: Click inside each cell and type in any text as needed.
Click on the Maximise button in order to maximise the screen for data input: |
---|
STEP 5: Click the Save button to save details.
This will appear in the assessment areas when assessing the criteria:
Notes:
Based on the settings you have enabled, one or more consequence ratings can be selected and saved.
If multiple ratings are selected, when calculating the risk rating, the consequence selected with the highest value is considered.
View other articles under this section: |