Strategy Configuration – Budget Threshold

Strategy Configuration – Budget Threshold

You can define budget thresholds (on track figure and off-track figures) using this option. This is currently used for defining the threshold for Budget Traffic Lights both within the system and in standard reports. You can choose to define the thresholds either via a percentage or exact value by selecting one of the options provided.

  • STEP 1: To do this, go to Administration > Configuration> Budget Threshold.

image-20240930-102841.png
Figure 1.1
  • STEP 2: Select your preferred option and enter ‘On track’ and ‘Off Track’ figures.

    • Define as percentage: Enter percentage values between 0 and 100 for On Track and Off Track cells

    • Define as Exact Value: Enter any integer values for On Track and Off Track cells.

  • STEP 3: Click the save icon.

    • If a Budget has not been entered, a blank traffic light will be displayed.

    • If Budget = 0 but Actual > 0, traffic light will be green.

If Exact value selected

YTD Variance = YTD Budget – YTD Actual

Variance < Lower Exception

Off Track

Lower Exception =< Variance =< Upper Exception

Monitor

Upper Exception < Variance

On Track

When Income is recorded with (-), reverse income budget and actual figures to (+) when calculating the variance.

If Percentage value selected

YTD Variance% = ((YTD Budget – YTD actual)/YTD Budget) *100

Variance % < Lower Exception

Off Track

Lower Exception =< Variance %=< Upper Exception

Monitor

Upper Exception < Variance%

On Track


<< Back to main section
Configuration

 

UG Footer 2024-20240103-072111.png

 

 

 

Related content

Camms.Strategy User Guide
Camms.Strategy User Guide
Read with this
Project Implementation Budget
Project Implementation Budget
More like this
Strategy Configuration – Action Progress Threshold
Strategy Configuration – Action Progress Threshold
More like this
Project Settings – Organisational Budget
Project Settings – Organisational Budget
More like this
Configuring Traffic Lights
Configuring Traffic Lights
More like this
Strategy Configuration – Action Progress Targets
Strategy Configuration – Action Progress Targets
More like this